Skip to content
Winnipeg & surrounding communitiesWinnipeg, MB
Landscaping & Hardscaping Services

BerryHill Landscaping & Construction

Grading & outdoor systems in Winnipeg

Water, grades and wiring shape how a yard works long after the surface is finished. We plan where rain can travel, how planting and lawn areas will be watered and where you need light after dusk.

A graded backyard with curved yellow layout marks, a loader and exposed soil
Crew and equipment work across a prepared backyard with the proposed layout marked on the soil.

Resolve the work underneath early.

  • Grades and water movement

    A site can have more than one water problem. We look at low areas, changes in level, downspout outlets and paving edges so a solution accounts for the whole route water takes.

  • Water for lawn and planting

    Separate areas that need different schedules. Grouping beds, sunny lawn and sheltered lawn by what they need helps you manage watering as the planting establishes.

  • Light at stairs and paths

    Choose what you need to see as you move through the yard and what deserves a softer accent. Decide where cabling will cross paving while the construction sequence is still flexible.

See the work up close.

See the parts that are often hidden at handover, from open ground beneath a deck to rough grading and prepared aggregate before paving.

A compact loader and crew work below a raised deck during backyard excavation
A compact loader and crew work below a raised deck during backyard excavation.
Open ground on a Ridgewood West site during patio demolition and soil preparation
Open ground on a Ridgewood West site during patio demolition and soil preparation.
Crew and pale prepared aggregate in a backyard before paving
Crew and pale prepared aggregate in a backyard before paving.

From site visit to finished work.

  1. Map the property

    Walk the yard with us and point out where water gathers, where lawn dries out and which entries you use at night. Photographs after rain can help.

  2. Coordinate routes and zones

    We review levels, possible water outlets, irrigation needs and fixture locations with the overall hardscape and planting layout.

  3. Sequence work before finishing

    When systems are part of a larger build, we coordinate routes and access before surface work. At handover we discuss the seasonal care relevant to the work.

Common questions.

Which system comes first?

Surface grades and drainage usually shape the options for the rest of the yard. Irrigation and lighting routes can then be coordinated with the layout before paving, lawn or planting.

Can this be handled during a renovation?

Yes. The existing surface, available access and condition of adjoining work help determine where we can work and what might need to be lifted or restored.

Do I need all three services?

The site may only need one. We can discuss what is urgent, what belongs in the larger plan and what can wait.

Plan your property

Let’s walk your yard.

Show us what you want to change. We’ll look at the property, talk through the work and help you decide where to start.